Home > Supplier Discovery > Company Profile
Website Snapshot of Permalok Corp.

PERMALOK CORP.

(314) 524-1900

472 Paul Ave., Ferguson, Missouri   63135 , USA

Visit Website Map & Directions

General Info:

permalok is an interlocking steel pipe joining system used in microtunneling, pipe jacking, pipe ramming, auger boring, and horizontal pipe driving projects. permalok steel pipe is a strong and reliable alternative to other traditional products used in trenchless installations such as: fiberglass reinforced pipe, reinforced concrete pipe, clay tile pipe, corrugated steel pipe, cast iron pipe, ductile iron pipe and bell and spigot pipe.

Products & Services:

  • Permalok
  • Steel Pipe
  • Interlocking Steel Pipe
  • Microtunneling
  • Pipe Jacking
  • Pipe Ramming
  • Auger Boring
  • Horizontal Pipe Driving
  • Casing
  • Steel Casing
  • Pipe Joining Directional Drilling
  • Trenchless Technology
  • Hdd Joints
  • Permalok Pipe
  • Nodig
  • Pipe Connectors
  • Permalock
  • Fiberglass Reinforced Pipe
  • Reinforced Concrete Pipe
  • Clay Pipe
  • Corrugated Steel Pipe
  • Culverts
  • Cast Iron Pipe
  • Machined Pipe Ends
  • Ductile Iron Pipe

Web Site Results

. and Northeast Construction, Inc. Pipe ramming is a non-steerable method of forming a bore by driving a steel casing, usually open-ended, horizontally through the ground... device to push pipe horizontally into the ground, forming a continuous string of pipe. Material is excavated as the pipe is pushed in. Auger boring is a pipe jacking method of forming...-effective method of pipe jacking. Horizontal Directional Drilling (HDD) is a fast method of trenchless construction that uses guided drilling to permanently place pipe beneath both natural and man made barriers such as rivers, shores, roads and buildings. ...
Impreglio / S A Healy JV Pipe Jacking Projects Pipe jacking utilizes a jacking device to push pipe horizontally into the ground, forming a continuous string of pipe. Material... is a non-steerable method of forming a bore by driving a steel casing, usually open-ended, horizontally through the ground with a percussive hammer. The soil may be removed from...Permalok - The Interlocking Pipe Joining System Projects The Permalok Interlocking Pipe Joining System enables engineers and contractors to complete underground construction...
was able to install the entire drive in only eight days and complete the installation within a deviation of only 1/4" horizontally and 4-1/2" vertically a record for this size pipe. The...Gold Beach, Oregon Projects > Pipe Ramming Name: Gold Beach, Oregon Owner: U.S. Forest Service/Dept. of Interior Engineer: U.S. Forest Service General Contractor: Freeman Rock... Enterprises Ramming Sub Contractor: SCCI Pipe Size : 197 feet of 120" O.D. Permalok Steel Casing with 1.25" walls The Problem: Install a new 120" diameter culvert to replace a failing...

Company Profile:

Contact: 314-524-1900
Address: 472 Paul Ave.
Ferguson, Missouri   63135 , USA
Url: http://www.permalok.com
Fax: 314-524-5702
   
Year Established: 1993
Annual Sales: US$10 Million - US$50 Million
Ads by Openfos

Also Viewed