Home > Supplier Discovery > Company Profile
Website Snapshot of BARTOSZEK ENGINEERING

BARTOSZEK ENGINEERING

(630) 844-0248

818 W Downer Pl, Aurora, Illinois   605064904 , USA

Visit Website Map & Directions

Web Site Results

Assembly of the Top Cradle of Concrete and Poly Shielding These pictures show the assembly of a top cradle which contains and supports the upper blocks of concrete and poly shielding. The main design challenge here is to prevent the downstream end of this cradle from exerting significant weight on t...
Photos of the Accumulator Shuttered Kicker Larry Bartoszek worked on at Fermilab A kicker magnet is one that gives a beam of charged particles being injected from a beam transport line to an accelerator ring a final "course adjustment" or "kick" that aligns the incoming beam with the orbit of the ac...
Conceptual Design of the HF Calorimeter These pages present renderings from the solid model of the HF calorimeter created as a starting point for discussion. They are developed as an assembly scenario to demonstrate that if the analysis shows that the pieces can take the loads, then there is a proce...
Mechanical Design for the Research Community World-wide Search our Site with Fusionbot: sitemap Please try out our new Google Search tool and let us know what you think: How to reach Bartoszek Engineering By snail-mail: Larry Bartoszek, P.E. Bartoszek Engineering 818 W. Downer Place Aurora, IL 60506...
Installing the Lower Half of Concrete and Poly Shielding This page shows the installation of the concrete and poly shielding around the lower half of the HF assembly. Getting the lowest blocks in requires the use of some type of forklift-like fixturing because the concrete and poly cannot be lowered...
Ads by Openfos