Home > Supplier Discovery > Company Profile
Website Snapshot of RMS Energy Co,LLC

RMS ENERGY CO,LLC

(888) 683-3630

1900 East 66th Ave, Denver, Colorado   80229 , USA

Visit Website Map & Directions

General Info:

RMS Energy is a professional nationwide energy construction and consulting firm with highly trained and experienced installation professionals who perform all aspects of equipment removal, reinstallation, retrofitting and testing. When a job requires disassembly and reassembly of Isolated Phase Bus Duct and its Components, our crews scope the project, put a plan in place, and get it done on time - and on budget. Because of our preparation, you can rest assured the final result is completed to your satisfaction

Products & Services:

  • Isophase Bus
  • Non-seg Phase Duct
  • Electrical Bus Duct
  • Copper Conductor
  • Aluminum Conductor
  • Electrical Insulation
  • Foreign Material Exclusion
  • Nuclear Plant Emergency Service
  • Coal Plant Emergency Service
  • High Conductivity
  • Aluminum Welding
  • Welding
  • Retrofitting
  • Transformer Replacement
  • Transformer Connections
  • Switchgear
  • Low Voltage
  • High Voltage
  • Transformer Failure
  • Xmfr Failure
  • Bus Duct Heating Issues
  • Isolated
  • Phase Bus Duct Welding And Installation
  • Ipb Welding And Installation
  • Stg
  • Ctg
  • Gsu
  • Aluminum Mig Welding
  • Aluminum Tig Welding
  • Silver Plate Electrical Contact Surfaces
  • Generator Terminal Adapter Ends
  • Braids
  • Flexible
  • Connectors
  • Shunts
  • Laminates
  • Bus Duct
  • Ipb Maintenance
  • Isolated Phase Bus Inspection
  • Isolated Phase Bus Maintenance
  • Silver Plating In Field
  • Fme Solutions
  • Gmaw Aluminum
  • Gtaw Aluminum
  • Rigging Certified
  • Ipbd
  • Ipb
  • Calvert
  • Delta
  • Ncco Trained Riggers
  • Powell
  • Abb
  • Ge Bus Duct
  • Westinghouse Bus
  • Gsu
  • Aux Transformer
  • Main Transformer
  • Aluminum Welding
  • Hi-pot Testing
  • Megger Testing
  • Power Plant Emergency
  • Ipb Overheating
  • Ipb Grounding
  • Transformer (xmfr) Grounding
  • Ipb Cooling
  • Ipb Monitoring
  • Ipb Overheating
  • Insulator Replacement
  • Insulator Supplier
  • Ipb Components
  • Mpt Lv Isolation
  • Main Transformer Lv Bushing Box Heating Issues
  • Main Transformer Lv Isolating
  • Mpt Lv Bushing Box Grounding
  • Main Generator Bushing Box Heating
  • Grounding
  • Isolating
  • Lv Bushing Box Isolating Washers
  • Lv Bushing Box Gasket
  • Transformer Dog House
  • Mpt And Gsu Lv Bushing Cabinet
  • Transformer Neutral Enclosure
  • Transformer Transition
  • On Apparatus Electro Silver Plating
  • Turbine Iso Phase Bus Duct
  • Generator Neutral Enclosure
  • Neutral Grounding Transformer Enclosure
  • Copper Welding
  • Braid Overheating
  • Braid Degradation
  • Braid Supplier
  • Laminate Failure
  • Laminate Supplier
  • Xmfr Inspection
  • Gsu Inspection
  • Power Plant Construction
  • Power Plant Maintenance
  • Technibus
  • National Conductor
  • Service Station Transformer
  • Azz Calvert Isolated
  • Phase Bus
  • Crown-electric
  • Powell/delta Unibus
  • Alfa Standard Isolated Phase Bus

Web Site Results

Trimble-County-RMS-Project.htm Careers Testimonials Contact Trimble County Generating Station: Isolated Phase Bus Reinstallation Owner : LG&E/Kentucky Utilities General Contractor... : Bechtel Contracted through : Powell/ Delta Unibus Division Scope : Disconnect braids from main GSU transformer, 2 Auxiliary transformers, Excitation and VT/SA cubicle... and Generator connections. Hi-Pot test the Isolated Phase Bus. Cut out first elbow at main GSU transformer on all 3 phases to assist with the transformer bushing removal/reinstallation. Re...
: Powell / Delta Unibus Division Scope : Disconnect braids from main GSU transformer, Cut enclosure at main GSU transformer on all 3 phases and remove GSU transformer Dog house.... Reinstall and Weld out GSU Dog Box, reinstall braids to GSU transformer (replace all hardware and isolation hardware.) RMS Energy - Isolated Phase Bus Duct Repair, Retrofitting... | ARMSTRONG ENERGY | BIG STONE | CAREERS AT RMS ENERGY | CONTACT RMS ENERGY | DUCT INSPECTION AND CLEANING | JK SPRUCE RMS PROJECT | JK SPRUCE RMS PROJECT | NICHOLS STATION | OAHE DAM...
and cut enclosure and conductor to hook up new Auxiliary transformer weld in new conductor connections, enclosure connections and bonding bars Installed braids, adaptor bars... | JK SPRUCE RMS PROJECT | JK SPRUCE RMS PROJECT | NICHOLS STATION | OAHE DAM RMS PROJECT | PALO VERDE NUCLEAR PLANT | PDFS | PREVENTATIVE MAINTENANCE | QA QC SAFETY | RMS ENERGY... DUCT REPLACEMENT | RMS ENERGY DUCT RETROFITTING | RMS ENERGY EMERGENCY SERVICES | RMS ENERGY NEW INSTALLATIONS | RMS ENERGY PROJECTS | RMS ENERGY SERVICES | RMS ENERGY SILVER...
the Rubberized boots connecting the isolated phase bus to the transformers Install Drip Edges over every joint on the vertical IPB risers. The purpose of this drip edge is to ensure... | CAREERS AT RMS ENERGY | CONTACT RMS ENERGY | DUCT INSPECTION AND CLEANING | JK SPRUCE RMS PROJECT | JK SPRUCE RMS PROJECT | NICHOLS STATION | OAHE DAM RMS PROJECT | PALO VERDE NUCLEAR... PLANT | PDFS | PREVENTATIVE MAINTENANCE | QA QC SAFETY | RMS ENERGY DUCT REPLACEMENT | RMS ENERGY DUCT RETROFITTING | RMS ENERGY EMERGENCY SERVICES | RMS ENERGY NEW INSTALLATIONS...

Company Profile:

Contact: 888-683-3630
Address: 1900 East 66th Ave
Denver, Colorado   80229 , USA
Url: http://www.isolatedphasebus.com
Fax: 888-297-1268
   
Year Established: 2012
Annual Sales: US$5 Million - US$10 Million
Market Sectors: Industrial
Business Type: Contruction & Contractor,Service
Sales/Service Area: National

Contract References:

  • Isolated Phase Bus Duct - Powell/Delta Unibus
  • Isolated Phase Bus Duct - Technibus
  • Modular Substations - MOD-POWER
Ads by Openfos

Also Viewed