Home > Supplier Discovery > Company Profile
Website Snapshot of HANDS ON J I T CO, THE

HANDS ON J I T CO, THE

(407) 299-5245

1443 Dingens Ave, Gotha, Florida   34734-0000 , USA

Visit Website Map & Directions

General Info:

Experienced Lean Consultants since 1988. Dramatic results in process improvement, lead time reduction, and quality / yield enhancement: SMED, TPM, 5S, six sigma, SPC, kanban controls, cellular manufacturing, failsafe, etc. www.handsongroup.com

Products & Services:

  • Lean Consulting
  • Founded In 1988
  • Lean
  • Six Sigma
  • Process Improvement
  • Just In Time
  • Tpm
  • Set-up Time
  • Smed
  • Tqc
  • Continuous Flow
  • Space Reduction
  • Pull System
  • Kanban
  • Kanban Systems
  • Spc
  • Total Quality
  • Re-engineering
  • Cells
  • Manufacturing Cells
  • Cellu

Web Site Results

machine to machine: i.e. create a factory within a factory. The big gains come not from the reduction of travel distance as much as the reduction of set-up times (the products have... similar physical attributes and therefore generally reduce the set-up effort), and from the ability, at times, to partial the lot and move items to the next sequential operation before... will obviously drive a concerted effort to reduce set-up costs. And the on-time all the time initiative will require several parallel initiatives: refined shop loading, and the rubber factory...
easily flow from machine to machine: i.e. create a factory within a factory. The big gains come not from the reduction of travel distance as much as the reduction of set-up times... (the products have similar physical attributes and therefore generally reduce the set-up effort), and from the ability, at times, to partial the lot and move items to the next... the lot sizes will obviously drive a concerted effort to reduce set-up costs. And the on-time all the time initiative will require several parallel initiatives: refined shop loading...
machine to machine: i.e. create a factory within a factory. The big gains come not from the reduction of travel distance as much as the reduction of set-up times (the products have... similar physical attributes and therefore generally reduce the set-up effort), and from the ability, at times, to partial the lot and move items to the next sequential operation before... will obviously drive a concerted effort to reduce set-up costs. And the on-time all the time initiative will require several parallel initiatives: refined shop loading, and the rubber factory...
easily flow from machine to machine: i.e. create a factory within a factory. The big gains come not from the reduction of travel distance as much as the reduction of set-up times... (the products have similar physical attributes and therefore generally reduce the set-up effort), and from the ability, at times, to partial the lot and move items to the next... the lot sizes will obviously drive a concerted effort to reduce set-up costs. And the on-time all the time initiative will require several parallel initiatives: refined shop loading...
to a job shop environment: Set-up times, run times, and routings typically vary too much from product to product. We will generally focus initially on order promising based on available... producing at a rate. So what are some reasonable alternatives? Where the above constraints are not an issue, go ahead and set up the line to produce at a rate. However, build... chris boycks | September 8, 2012 | Reply Jack, does takt time work for a contract fabrication job shop. At any given day we have 60,000 to 100,000 pc parts in wip for up to 6-7...

Company Profile:

Contact: 407-299-5245
Address: 1443 Dingens Ave
Gotha, Florida   34734-0000 , USA
Url: http://www.handsongroup.com
Fax: 407-290-1441
   
Year Established: 1988
Business Type: Service
Ads by Openfos

Also Viewed