Home > Supplier Discovery > Company Profile
Website Snapshot of OTAK GROUP, INC.

OTAK GROUP, INC.

(904) 225-2588

96126 Mount Zion Loop, Yulee, Florida   320974855 , USA

Visit Website Map & Directions

General Info:

General contractor, marine, bridge and pile installation, concrete work, formwork, carpentry, framing, decks, boardwalks, sitework, park construction, Mgmt Svcs, comm. buildings, aviation facilities construction and civil work

Products & Services:

  • Design Build Service
  • Historic Renovation
  • Masonry
  • Concrete Pavement
  • Rehabilitation
  • Concrete Repairs
  • Foundations
  • Utilities
  • Earthwork
  • Site Work
  • Marine
  • Environmental
  • Pile Driving
  • Bulkhead
  • Piers
  • Parks
  • Storm Damage
  • Demolition
  • Seawalls
  • Excavation
  • Asphalt
  • Bridge
  • Interior Renovation
  • Emergency

Web Site Results

Marine Hauling Pile Driving Pier Reconstruction Civil Construction Services Asphalt Paving Natural Resource and Environmental Improvements Site work Utilities Drainage Stabilization... of existing dockage associated with the Whitewater Bay Marine timber docks, pier and pilings. Other items included: demolition of the fixed concrete dock and slab and associated timber... and piles; demolition of timber pier and piles; and installation of polyethylene isolators and replacement of aluminum channels and angles in the Florida Bay Marina. Specific items...
Construction & Historic Renovation Boat Launch & Boat House Construction Dredging Docks, Quaywalls & Wharfs Shoreline Stabilization Marine Hauling Pile Driving Pier Reconstruction Civil... measures. Removal of debris piles located within the project site limits to a designated on base location. Strip site as needed to construct new laydown area. Tie into existing... items of work include: Installation of erosion control measures. Removal of debris piles located within the project site limits to a designated on base location. Strip site as needed...
Construction & Historic Renovation Boat Launch & Boat House Construction Dredging Docks, Quaywalls & Wharfs Shoreline Stabilization Marine Hauling Pile Driving Pier Reconstruction... of the existing 3x10 ledger beam alongside the lower deck pile caps, and demolition of existing decking and fasteners for the entire length of Pier 1. New work items were comprised...
Construction & Historic Renovation Boat Launch & Boat House Construction Dredging Docks, Quaywalls & Wharfs Shoreline Stabilization Marine Hauling Pile Driving Pier Reconstruction... Construction Cost: $2,723,152.00 Project Description: Slipway Drive: The work includes demolition of an existing shingle-surfaced parking area, grading and compaction, construction of a new...
Construction & Historic Renovation Boat Launch & Boat House Construction Dredging Docks, Quaywalls & Wharfs Shoreline Stabilization Marine Hauling Pile Driving Pier Reconstruction Civil...

Company Profile:

Contact: 904-225-2588
Address: 96126 Mount Zion Loop
Yulee, Florida   320974855 , USA
Url: http://www.otakgroup.com
Fax: 904-225-1001
   
Annual Sales: US$5 Million - US$10 Million
Business Type: Contruction & Contractor,Wholesale & Distributor
Ownership: Minority owned
Ads by Openfos

Also Viewed