GRIFFIN DEWATERING NEW ENGLAND, INC. (CT)

(860) 643-9585

299 Hop River Rd, Bolton, Connecticut   6043 , USA

Visit Website Map & Directions

General Info:

Griffin Has provided service and equipment to the construction dewatering and groundwater pumping market since 1934. For over 70 years Griffin has gained the respect of our customers by applying all the right solutions to their groundwater problems on pro

Products & Services:

  • Construction Equipment - Wellpoint Systems
  • Construction - Dam
  • Construction - Dams
  • Waterways
  • Docks & Other Marine Structure
  • Construction - Drainage System

Web Site Results

functions as both a designer and project manager for dewatering and extraction systems. And also designs by-pass pumping applications. Jose specialized in Construction Technology.... 713.671.7026 17 Years Ground Water/Dewatering Experience 15 Years with Griffin Key Projects: River Walk expansion in San Antonio, Texas Saluda Dam remediation project in Lexington..., dewatering system winterizing methods and conventional deep wells, multi-stage efffluent bypass systems for the petro-chemical, and construction industries. Larry Duhaime Project...
Griffin bypass of a 30    sewer line. The equipment was sized for a peak flow rate of 24 million gallons per day (16,667 gallons per minute) and consisted of 4 primary pumps and 2 standby pumps. Project was located in Orange Co, California.
pumps, contractors can bypass sewage during sewer line repairs - getting tough projects done and keeping the system working for the community that relies on it. Prado Dam sewer... bypass systems are used to transfer water supplies and sewage flow, so that these vital services are uninterrupted during construction. Griffin Dewatering and Griffin Pump...
edition of Pumps & Systems "Mention dewatering to anyone in the underground construction trade, and they'll likely state that it is one of the most important phases in the project......" Sewer Bypass Fundamentals in the July 2009 Edition of Trenchless Technology "Typically bypass pumping will occur because of new construction, lift station rehabilitation, lift..., Houston-based Griffin Dewatering Corp. began pumping 15 million gallons of water from the site. It also used 42 10-in.-dia, 75-ft-deep wells outside the dam perimeter to lower...